
Industrial building
Liner
Factory · District 22 · 22 of 30 years left · 1 Tuas Bay Close, Singapore 636997
Median $258 psf over the 12 months to Oct 2026, from 18 sales on file. Latest: $3,375,000 for 12,239 sq ft in Aug 2026.
- Lease left, 30-year title
- 22 yrs
- Sales, 12 months to Oct 2026
- 4
- To Tuas West Road
- 2.0 km
Background: District 22, not this building. Photo credits
Liner · 12 months to Oct 2026 Prices
- Median psf
- $258
- Median price
- $3.94M
- Typical size, sq ft
- 19,429
- Unit sales
- 4
By floor
| Sales | Median price | Psf | |
|---|---|---|---|
| Ground floor | 2 | $4.63M | $258 |
| Levels 2 to 5 | 1 | $3.38M | $276 |
| Levels 6 to 10 | 1 | $4.5M | $165 |
0 of 3 sellers with a known purchase price sold for more than they paid; the median lost $1.24M, -7.5% a year.
18 sales Past transactions
18 sales, Oct 2021 to Oct 2026
| Type | Lease left | Sale | |||||
|---|---|---|---|---|---|---|---|
| 7 Aug 2026 | Factory | 5 | 12,239 | $3,375,000 | $276 | 22 yrs | Resale |
| 6 Aug 2026 | Factory | 1 | 26,619 | $7,100,000 | $267 | 22 yrs | Resale |
| 18 Mar 2026 | Factory | 6 | 27,341 | $4,500,000 | $165 | 22 yrs | Resale |
| 26 Dec 2025 | Factory | 1 | 8,676 | $2,150,000 | $248 | 23 yrs | Resale |
| 27 Jul 2023 | Factory | 3 | 3,746 | $1,440,000 | $384 | 25 yrs | Resale |
| 27 Jul 2023 | Factory | 3 | 3,746 | $1,440,000 | $384 | 25 yrs | Resale |
| 6 Jun 2023 | Factory | 1 | 8,676 | $3,026,000 | $349 | 25 yrs | Resale |
| 21 Oct 2022 | Factory | 3 | 5,651 | $1,600,000 | $283 | 26 yrs | Resale |
| 19 Sep 2022 | Factory | 5 | 12,497 | $4,610,000 | $369 | 26 yrs | Resale |
| 13 Sep 2022 | Factory | 1 | 12,454 | $4,151,000 | $333 | 26 yrs | Resale |
URA Realis caveats via Huttons, to 6 Oct 2026. Check the yield on one unit →
District 22 Nearby buildings
- Gate+Factory · 32 of 33 years left$608 psf
- 8 @ Tradehub 21Factory · 37 of 60 years left$572 psf
- Eco-Tech@SunviewFactory · 16 of 30 years left$168 psf
- West Connect BuildingFactory · 17 of 30 years left$267 psf
- Pioneer PointFactory · 15 of 30 years left$365 psf
- Pioneer CentreFactory · 13 of 30 years left$272 psf
- Enterprise HubFactory · 31 of 60 years left$323 psf
- Toh Guan CentreFactory · 31 of 60 years left$507 psf
Notes: how these figures are worked out
- Prices: URA Realis caveats via Huttons, 20 Dec 2021 to 6 Oct 2026. Medians use units sold one by one; a whole floor or several units under one caveat is listed but left out of the medians. The tiles, size and floor tables cover the 12 months to Oct 2026.
- The trend plots the median psf per half-year from two sales up; the district line is every unit sale of that type in the district, from eight sales up. A median moves with which units sold (floor, size, ground-floor shops), so a thin half-year can swing.
- Profit is the sale price less the seller’s own purchase price, as the caveat pairs them, before stamp duty, GST and fees; “a year” is that gain as a yearly rate over the time held. Unit numbers are left out.
- Lease left is in whole years on the day of sale, from the lease start on the caveat.
- Address and map point: OneMap (SLA) search for the building’s name, kept where its postal district matches the caveats.