Skip to content
TRIBE

Industrial building

Pioneer Point

Factory · District 22 · 15 of 30 years left · 5 Soon Lee Street, Singapore 627607

Median $365 psf over the 12 months to Oct 2026, from 110 sales on file. Latest: $340,000 for 969 sq ft in Sept 2026.

Lease left, 30-year title
15 yrs
Sales, 12 months to Oct 2026
16
To Pioneer
430 m

Background: District 22, not this building. Photo credits

Pioneer Point · 12 months to Oct 2026 Prices

Median psf
$365
Median price
$370k
Typical size, sq ft
1,055
Unit sales
16

By size

SalesMedian pricePsf
500 to 999 sq ft6$370k$386
1,000 to 1,999 sq ft10$370k$347

By floor

SalesMedian pricePsf
Ground floor3$680k$400
Levels 2 to 511$365k$351
Levels 6 to 102$384k$381

30 of 87 sellers with a known purchase price sold for more than they paid; the median lost $49k, -1.3% a year.

110 sales Past transactions

$240$390$550H2 2021H2 2022H2 2023H2 2024H2 2025H2 2026Jul–Dec 2021: $279 psfJan–Jun 2022: $324 psfJul–Dec 2022: $311 psfJan–Jun 2023: $321 psfJul–Dec 2023: $341 psfJan–Jun 2024: $355 psfJul–Dec 2024: $344 psfJan–Jun 2025: $361 psfJul–Dec 2025: $354 psfJan–Jun 2026: $408 psfJul–Dec 2026: $381 psf
This building, median psf per half-year (2 sales up) District 22, all types (8 sales up)

110 sales, Oct 2021 to Oct 2026

TypeLease leftSale
21 Sep 2026Factory2969$340,000$35115 yrsResale
3 Sep 2026Factory31,066$370,000$34715 yrsResale
28 Aug 2026Factory3958$375,000$39115 yrsResale
7 Aug 2026Factory11,087$420,000$38615 yrsResale
23 Jul 2026Factory2958$365,000$38115 yrsResale
7 May 2026Factory11,711$720,000$42115 yrsResale
13 Feb 2026Factory11,701$680,000$40016 yrsResale
26 Jan 2026Factory21,066$388,000$36416 yrsResale
19 Jan 2026Factory6958$398,000$41516 yrsResale
5 Dec 2025Factory4958$380,000$39716 yrsResale

URA Realis caveats via Huttons, to 6 Oct 2026. Check the yield on one unit →

Notes: how these figures are worked out
  • Prices: URA Realis caveats via Huttons, 21 Oct 2021 to 6 Oct 2026. Medians use units sold one by one; a whole floor or several units under one caveat is listed but left out of the medians. The tiles, size and floor tables cover the 12 months to Oct 2026.
  • The trend plots the median psf per half-year from two sales up; the district line is every unit sale of that type in the district, from eight sales up. A median moves with which units sold (floor, size, ground-floor shops), so a thin half-year can swing.
  • Profit is the sale price less the seller’s own purchase price, as the caveat pairs them, before stamp duty, GST and fees; “a year” is that gain as a yearly rate over the time held. Unit numbers are left out.
  • Lease left is in whole years on the day of sale, from the lease start on the caveat.
  • Address and map point: OneMap (SLA) search for the building’s name, kept where its postal district matches the caveats.